Hydropower Development-A Case Study in Pakistan

Hydropower Development-A Case Study in Pakistan

AngličtinaMäkká väzbaTlač na objednávku
Rehman, Waqar-Ur
VDM Verlag Dr. Müller
EAN: 9783639230994
Tlač na objednávku
Predpokladané dodanie v piatok, 10. júla 2026
50,05 €
Bežná cena: 55,62 €
Zľava 10 %
ks
Chcete tento titul ešte dnes?
kníhkupectvo Megabooks Banská Bystrica
nie je dostupné
kníhkupectvo Megabooks Bratislava
nie je dostupné
kníhkupectvo Megabooks Košice
nie je dostupné

Podrobné informácie

Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Ghazi-Barotha is a runoff river hydropower project located at downstream of Tarbela and on left bank of Indus River. The project was studied to feasibility level in 1990, implementation was started in 1995 and now in operation since 2003. The project is being operated with full capacity during peak hours but be influenced by Kalabagh reservoir during August to March. The reduction in head to some extent reduces the power and energy. This research work had analyzed and evaluated the extent of reduced power and energy considering 20 year flow data. Finally conclusion and recommendations are drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally.
EAN 9783639230994
ISBN 363923099X
Typ produktu Mäkká väzba
Vydavateľ VDM Verlag Dr. Müller
Dátum vydania 20. januára 2010
Stránky 72
Jazyk English
Rozmery 229 x 152 x 4
Krajina Germany
Čitatelia General
Autori Mahmood, Sajid; Rehman, Waqar-Ur
Informácie o výrobcovi
Kontaktné informácie výrobcu momentálne nie sú dostupné online, na náprave intenzívne pracujeme. Ak informáciu potrebujete, napíšte nám na [email protected], radi vám ju poskytneme.